Planned infrastructure/ infrastructure under implementation

Road infrastructure:

  1. The construction of the missing fragment of the Legnica ring road in the course of the National Road No. 94

The purpose of the investment project is to build the Legnica ring road, enabling the creation of a consistent traffic system of roads A4, S3 (DK3) and DK94, of national and international significance, bypassing the centre of Legnica. The estimated term of finishing the investment is 2029.

  1. Other important road investment projects:

  • The construction of the county road connecting the road built as part of S3 with Lotnicza Street in Legnica. The estimated term of finishing the investment is 2028.
  • The reconstruction of Złotoryjska Street in Legnica. It takes traffic from the centre of the towards Expressway S3 and Motorway A4. The estimated term of finishing the investment is 2029.
  • "Reconstruction of the intersection of st. Jaworzyńska with a municipal road to the turbine roundabout in Legnica, in order to improve the conditions of service and development of investment areas". Estimated date of completion of the investment in 2026.

 

Railway infrastructure

  1. The revitalisation of the railway line No. 284 in the Legnica – Złotoryja – Jerzmanice-Zdrój section (on the initiative of the Self-Government of Lower SilesiaVoivodship). The purpose of the investment project is to connect Legnica and Złotoryja and to incorporate the Złotoryja County into the regional passenger transport network, thus ensuring high-quality collective transport on the transport route in place connecting Złotoryja and Legnica with Wrocław.
  2. The expansion of the railway line No. 289 between Legnica and Rudna Gwizdanów (the construction of the second track, in partnership with the interested self-governments, the Self-Government of the Voivodship will prepare a feasibility study for the investment project).

Electricity prepared on the basis of the "Assumptions to the plan for the supply of heat, electricity and gaseous fuels for the city of Legnica for the years 2020-2035" adopted by Resolution No. XXV/324/20 of the Legnica City Council on November 30, 2020, updated by Resolution No. LXIII/690/23 of the Legnica City Council on November 27, 2023

Investment plans of Tauron:

  • Length of the new electricity network:
    • 2026 - 2038: LV – 4,000 m, MV – 3,500 m.
  • The number of new transformer stations (20 kV/0.4 kV):
    • 2026 - 2038: 6 sites – Pocztowa, Skarbowa, Parkowa, Lotnicza, Chojnowska, Żołnierska, Marynarska, Żytnia, Prusa, Leszczyńska, Sierocińska, Boiskowa and Jaworzyńska Streets, Stary Browar
  • Length of the modernised electricity network:
    • 2026 - 2038: LV – 4,000 m, MV – 4,000 m.
  • The number of modernised transformer stations:
    • 2026 - 2038: 20 site – Kartuzy, the Sienkiewicz Housing Estate, the Piekary Housing Estate.

The construction of new MV and LV electrical facilities will result from the need to connect users, in accordance with the Act on Energy Law and its implementing regulations, and to meet the higher energy demand from existing users.

Gas prepared on the basis of the "Assumptions to the plan for the supply of heat, electricity and gaseous fuels for the city of Legnica for the years 2020-2035" adopted by Resolution No. XXV/324/20 of the Legnica City Council on November 30, 2020, updated by Resolution No. LXIII/690/23 of the Legnica City Council on November 27, 2023

Currently, in consultation with The GAZ-SYSTEM S.A., PSG Sp. z o. o. is expanding the Legnica Bartoszów gas station to a capacity of 33,000 m3/h, which is expected to be completed by the end of 2024. This investment will increase gas transmission capacity to customers located within the city. The distributor assumes that the size of this station will secure gas fuel supplies in the long term.

The GAZ-SYSTEM S.A. Development Plan for 2022 - 2031, approved by the President of the Energy Regulatory Office, assumes the implementation of the following investment projects:

  1. Legnica Bartoszów metering station,
  2. DN200 gas pipeline to the Legnica Bartoszów gas station,
  3. DN300 gas pipeline Krzeczyn – Legnica HM, 24 km – southern section.